About us

Engineering safer CNG storage since 2014

A single facility at Karmad, Aurangabad where design, forming, heat treatment, testing and dispatch all happen under one roof.

Home/About

Our story

Started by engineers who were tired of guessing

Aurik Green Solutions began in 2014 as a two-line workshop supplying cylinder cradles to retrofitters around Aurangabad. The founders — three pressure-vessel engineers — kept running into the same problem: cylinders arrived without traceable test records, and workshops had no way to verify what they were fitting.

So we started making the cylinders too, and we built the traceability in from day one. Every unit that leaves our gate carries a serial number that resolves to its heat number, forming batch, heat-treatment cycle, operator, and hydrostatic test result. Twelve years later that discipline is still the reason customers stay.

Founded 2014Karmad, Aurangabad130 employees 4,80,000 sq ft3,00,000 units / year
QC STATION
Milestones

How we got here

  • 2014Company founded at Karmad, Aurangabad

    Two-line workshop producing cylinder cradles, straps and mounting hardware for local retrofitters.

  • 2016First seamless steel cylinder line commissioned

    Billet-to-cylinder capability with in-house heat treatment and hydrostatic testing.

  • 2018PESO approval and BIS licence

    Design registration completed; supply begins to organised fleet operators across Maharashtra.

  • 2020Three-wheeler product line launched

    Compact 20–35 L cylinders with chassis-specific cradles for the auto rickshaw segment.

  • 2022Composite (Type 3) cylinder programme

    Filament winding cell added; first carbon-overwrapped cylinders approved for road use.

  • 2024OEM supply and 140-dealer network

    PPAP-level documentation for factory-fitted CNG variants; nationwide re-testing network established.

What we stand for

Four things we will not compromise on

Safety first

A cylinder is a pressure vessel carried by a family. Every design decision starts from that.

Traceability

If we cannot tell you which billet a cylinder came from, we do not ship it.

Predictable delivery

Committed dates are held. Where they slip, you hear it from us before you have to ask.

Cleaner transport

Every converted vehicle is a small, permanent reduction in urban emissions. That is the point.

0Annual capacity (units)
0People employed
0States served
0First-pass test yield

Ready to move your fleet to CNG?

Send us the vehicle model and the quantity. A sales engineer will come back with capacity options, a dimensional drawing and a firm price within one working day.