Tested, stamped, and traceable to the billet
A cylinder is only as good as the test record behind it. Here is exactly what we do to each one before it leaves the gate.
Home/Quality
Approvals and certifications
PESO
Design registration and approval from the Petroleum & Explosives Safety Organisation for each cylinder family.
ISO 11439
The international standard for high-pressure gas cylinders for onboard vehicle storage — the basis of our design qualification.
IS 15490 / BIS
Indian Standard conformity for seamless steel CNG cylinders, with BIS licence and marking.
AIS-028
Automotive Industry Standard covering CNG fuel system components and their type-approval testing.
Certification names shown are placeholders for this demo build. Publish only approvals you actually hold, with certificate numbers and validity dates.
Nine checkpoints between billet and dispatch
- Step 01Incoming material verification
Every billet heat is checked against the mill certificate — chemistry, ultrasonic soundness and dimensional conformity.
- Step 02Hot forming
Billet piercing and drawing, then hot spinning of the base and the neck on a dedicated cell.
- Step 03Heat treatment
Quench and temper under a recorded furnace profile; the cycle chart is stored against the batch.
- Step 04Machining & threading
Neck threading to the specified valve interface, followed by thread gauge verification.
- Step 05Ultrasonic & visual inspection
Wall thickness mapping and 100% internal/external visual inspection under lighting to ISO 19078.
- Step 06Hydrostatic proof test
Every cylinder proof-tested; volumetric expansion recorded and compared with the permanent set limit.
- Step 07Batch destructive testing
Burst, cycle, flattening and tensile tests on samples drawn from each production batch.
- Step 08Surface treatment & stamping
Shot blasting, powder coating, then permanent stamping of serial, batch, test date and next due date.
- Step 09Documentation & dispatch
Test certificate generated per unit, QR-linked to the full batch record, and packed with the cylinder.
Safety, testing and service life